These photos show the smaller backchannel river crossing. This was once a narrow 2 lane bridge. Since MN-DOT has plans to make this river crossing into a 4 lane roadway, the new 1998 bridge was built as a 4 lane bridge. The main channel bridge has also been replaced and built as a 4 lane bridge, so it is expected that MN-DOT will complete the 4 lane project soon (perhaps by 2010).
The photos above and below show a river crossing headed north. The photo above is approching the backchannel while descending into the river valley. The photo below shows the bridge just as we are entering the bridge strucutre. The bottom photo was taken after crossing the smaller bridge but before crossing the main channel.