Pioneer SPEC Rack Assembly Instructions
This is a scan of the Pioneer SPEC Rack Assembly instruction
manual from 1977. One should always break a rack down when
it is being shipped. That is rather easy given that there
are just a few machine screws and 6 blind nut connectors. Never
ship or transport a SPEC rack with the components mounted in the
rack. Click on each thumbnail below to see the full size page.
Return To John Weeks Silver Pioneer Page
Return To John Weeks Home Page
Authored by John A. Weeks III, Copyright © 2004, all rights reserved.
For further information, contact:
john@johnweeks.com