Pioneer SPEC Rack Assembly Instructions


This is a scan of the Pioneer SPEC Rack Assembly instruction manual from 1977. One should always break a rack down when it is being shipped. That is rather easy given that there are just a few machine screws and 6 blind nut connectors. Never ship or transport a SPEC rack with the components mounted in the rack. Click on each thumbnail below to see the full size page.
Page 1 Page 2 Page 3 Page 4
Page #1 Page #2 Page #3 Page #4
   
Page 5 Page 6 Page 7 Page 8
Page #5 Page #6 Page #7 Page #8

Silver Pioneer Return To John Weeks Silver Pioneer Page
Home Return To John Weeks Home Page
Authored by John A. Weeks III, Copyright © 2004, all rights reserved.
For further information, contact: john@johnweeks.com