The problem is that there was no way to get vehicles out to the area where the new lock and dam was built. The solution is a temporary bridge, which is placed across the auxiliary lock during the months of low recreational boat traffic. When the lock is needed, the barge in the lock simply lifts the bridge, and floats it away for storage. The bottom photo shows the bridge tender barge, and the black brackets that make up the lifting mechanism.